We strip out the old bathroom and build a new one: from the pipework to the last light.
Removing the old bathroom
New water and waste pipes
Waterproofing
Wall and floor tiles, including large-format
Walk-in shower without a tray
Wall-hung WC and bidet
Lighting, backlit niches and mirror
Fitting the sanitary ware
What decides how long it lasts
How long a bathroom lasts is decided by what is hidden under the tiles: pipework, waste with the right fall, and waterproofing. That is why we give them the same care as the tiles you can see.
Walk-in shower and large format
A floor-level shower needs a fall to the drain and room for the waste under the floor. Large-format tiles need a flat base and precisely set-out joints. Both are decided at the survey, not when the tiling starts.
Light and storage
Backlit niches, a lit mirror and cisterns hidden behind a wall frame make a bathroom calm. Where the lights, sockets and niches go is designed together with the pipework.
We walk through the house or apartment, listen to your brief and measure everything.
02
Budget
We prepare an itemised budget and a proposed sequence of works.
03
Design and materials
We fine-tune the layout and choose the materials and fittings.
04
Contract and schedule
Scope, price and dates are put in writing before we start.
05
Construction
You are kept up to date on progress, including photos.
06
Handover
We walk through the finished work together and hand over the documentation.
Frequently asked questions
How much does a bathroom renovation cost?
The price depends on the condition and the scope of work. After the survey we prepare an itemised budget; scope, price and dates are put in writing before we start.
Is a walk-in shower possible in an older house?
It depends on the floor height and the route of the waste pipe. We assess it during the survey.
Will you help us choose tiles and sanitary ware?
Yes. We choose materials and fittings together before the work starts.
How long will we be without a bathroom?
It depends on the scope of work. You will see when the bathroom is out of use in the schedule before we start.
Can you redo a bathroom in a prefab building?
Yes, including replacing the plastic bathroom core. We specify the approach during the survey.