We design the kitchen together with the services and finishes, so that everything falls into place.
Removing the old kitchen
Moving water, waste and electrics
Preparation for appliances
Tiling, plastering and floors
Made-to-measure kitchen, including an island
Worktop, including stone
A kitchen starts with the services
Where the sink, dishwasher, hob or island can go is decided by the water, waste and electrics. That is why we plan them together with the kitchen design, not after it — including dedicated circuits for appliances and the cooker hood extraction.
Made to measure
We design the kitchen for the room and for the way you cook: where the appliances go, storage, an island and the worktop, stone if you like.
What affects the price
The price depends mostly on whether services are moved, then on the materials — fronts, worktop, appliances. You get the itemised budget after the survey, before you sign anything.
How the renovation works
01
Consultation and survey
We walk through the house or apartment, listen to your brief and measure everything.
02
Budget
We prepare an itemised budget and a proposed sequence of works.
03
Design and materials
We fine-tune the layout and choose the materials and fittings.
04
Contract and schedule
Scope, price and dates are put in writing before we start.
05
Construction
You are kept up to date on progress, including photos.
06
Handover
We walk through the finished work together and hand over the documentation.
Frequently asked questions
How much does a kitchen renovation cost?
The price depends on the condition and the scope of work. After the survey we prepare an itemised budget; scope, price and dates are put in writing before we start.
Can the sink be moved or an island added?
It depends on the route of the waste pipe and services. We assess it during the survey and propose a solution.
Will you help us choose materials?
Yes. We choose materials and fittings together before the work starts.
How long will we be without a kitchen?
It depends on the scope of work. You will see when the kitchen is out of use in the schedule before we start.